Previously accomplished Heavy lifting jobs by Gemini Power Hydraulics & Fagioli
Year
2010
Industry
Oil & Gas
Project
Tripura Block
Client
Jubiliant - Tripura (On Shore)
& BG - Offshore
Hyd. Bolt Torquing
(Nipple Up &
Nipple Down)
2006
Construction
Lifting of Bridge
Segments
Larsen & Toubro, Jordan
Lifting of Bridge
Segments at Jordan
for L & T at Jordan
2001
Power
Lifting of 226MT Boiler
Drum at NTPC-TSTPP
at Talcher, Orissa
Bharat Heavy Electricals
Limited, Talcher
Lifting of 226MT Boiler
Drum temporarily by
20mm to carry out
replacement repair work
in U-bolts by BHEL. and
then lowering at a required position,
strand jacking system and
power packs.
2000
Petro
Chemical
Erection of Vacuum
Column at Indian Oil
Corporation Limited,
Haldia
Indian Oil Corporation Limited
Haldia through Bharat Heavy
Plate & Vessels Limited
Erection of 62 m tail
Vaccum Column of
560 MT at an
elevation of 19.05
mtrs, above G.L
2000
Power
PPN 330MW Combined
Cycle Power Plant,
Pillaiperumalnallur, Tamil
Nadu
Mitsubishi Heavy Industries Ltd
& Marubeni Corporation, Japan.
Onbasing of Rotating
Equipment
(Lower Half)
170T Gas Turbine
Generator
170T Steam Turbine
Generators
1999
Civil
Aircraft Hanger Roof
Lift for Air India,
Bombay Airport
Ircon International Limited and
Octamec Engineers Limited
Lifting of 1100
Tonnes Aircraft
hanger Roof
admeasuring 130m
x90 m upto a height
of 26 mtrs
1998
Power
Lifting & positioning of
HRSG Modules for
Powergen India Pvt.Ltd -
Bharuch, Gujarat
Universal Erectors, Ahmedabad
through Deutsche Babcock and
EPC Contractor, MIS. Siemens
-Germany
Lifting of 3 x 36 =
108 numbers HRSG
Boiler Modules to a
height of 25 metres
with L50 Strand
Jacks and L413D
Powerpack