Erection of Girders at Sikka Site
10th April, 2012
Drum Lifting (Weight 133.258 MT) at Sikka Site 23rd May, 2012
ESP & Boiler Structure at Sikka Site
3rd October, 2012
1st tier of Boiler erected at Uchpinda Site 31st May, 2012
Boiler Structure at Uchpinda Site
3rd October, 2012
Boiler Drum Lifting (Weight 185 MT) at Uchpinda 31st December, 2012
Strand Jacks in Operation at Barh Site 6th Oct, 2012
Pre-Assembly bed under preparation 22nd May, 2013
Boiler Structure at Cuddalore site 22nd May, 2013